Knauf Corporate Building

The two-story, 24,860 SF, LEED-Gold Certified Knauf Insulation Corporate Office building addition will accommodate 44 offices, a 126 seat public classroom named “KnaufAcademy,” and a corporate fitness center.   read more

Mt. Pisgah Baptist Church

Shelbyville, Indiana
 
The goal of the Mt. Pisgah Baptist Church’s building committee was to have an affordable sanctuary design that would compliment the present facility built in the 1800s. The design of the facility utilized the cost savings of a pre-engineered metal building system and the use of Indiana limestone on the exterior that matched the original sanctuary.
 
Pastor Dr. Robb Barlow said, “Runnebohm Construction helped us conceptualize the structure by patiently working with our building committee and giving us some great suggestions in our design that would give us a more functional space for our dollar.”
 

 

 

 

 

 


Return to Project List